Construction update: Middle School elevator tower gets roof

Image
Surveying the fire lane and installing underground storm drain At new Admin/Library Building, we’re tying-in sewer lines and installing underground conduit. Pouring concrete on vertical walls of a portion of admin building (bottom photo), and framing walls on the other segment of the building. Middle School Building (top photo): Installing fire riser and low-voltage electrical lines, a handrail on the second floor, and restroom finishes. Installation continues of handrail on the second floor and restroom finishes. Elevator tower roofing taking place. Also installing drywall within elevator tower.

The new staircase is open!

Image
The Outdoor Stairway is Open! Linking the upper-level parking lot to the Middle School Quad, it was opened for student and staff use on   April 22. All exposed shellac finishes at the wood shop and ceramic’s room have been encapsulated with a primer and two coats of paint as a PCB Interim measure. The water leak at the upper playground was permanently repaired. Utility electrical tie-in at Building H — to ultimately provide power at New Middle School Building — was completed over the break Overall Significant Construction Progress on-going for New Middle School Building and the New Main Building